1069 Wexford Way, listed by Harry Norman Realtors, is under contract to a Lake Team client.
This blog contains news and sales information about the lakes of Rabun County.
Friday, October 29, 2010
Thursday, October 28, 2010
Highest Priced Home Ever on Lake Burton Now Under Contract
The Pointe, tri-listed for $10,900,000 by three agents with Harry Norman Luxury Lake and Mountains (Michael McGaughey, Julie Barnett & Crawford Grice) is now under contract.
Tuesday, October 26, 2010
Home Under Contract on Lake Rabun
Located on the Pigeon Run section of Lake Rabun, this home listed by Remax for $2,275,000 is now under contract.
Friday, October 22, 2010
Another Tear Down Sold on Lake Burton
This home on Lake Burton closed today for $775,000. It was last listed for $975,000. To date there have been 8 tear downs or lots sold on Lake Burton this year, with another 2 under contract. These properties are selling at an average of 75% of their last listed price.
Tuesday, October 12, 2010
Lake Rabun Price Reduction
This spectacular home at 3994 Brandon Mill Road on Lake Rabun, listed by The Lake Team, has been reduced to $1,299,000.
Thursday, October 7, 2010
Another Home on Lake Burton is Under Contract
Listed by Michael McGaughey for $2.1m, this home at 460 Moccasin Creek on Lake Burton is now under contract.
Drawdown Schedule for Lake Burton, Rabun and Seed Announced by Georgia Power
RABUN DRAWDOWN: Drawdown scheduled for Lake Rabun. We plan to lower Lake
Rabun approximately eight feet (8’) starting October 25, 2010. Lake Rabun
will begin to refill on November 18, 2010 and returning to normal operating
level by November 25, 2010.
SEED DRAWDOWN: Drawdown scheduled for Lake Seed. We plan to lower Lake
Seed approximately twelve feet (12’) starting November 18, 2010. Lake Seed
will begin to refill on December 20, 2010 and returning to normal operating
level by December 31, 2010.
BURTON DRAWDOWN: Drawdown scheduled for Lake Burton. We plan to lower
Lake Burton approximately eight feet (8’) starting October 18, 2010. Lake
Burton will begin to refill on February 1, 2011 and returning to normal
operating level by May 1, 2011.
During the drawdown, fluctuations may occur on a daily basis due to
generation demand, rainfall, or other events.
To receive a construction permit for new structures or for maintenance of
existing structures, a construction application will have to be submitted,
along with plans, to Georgia Power for review and approval. Residents
planning to build a new seawall will need to complete a Buffer Disturbance
Request form that will have to be approved by County LIA before a permit
will be issued by Georgia Power.
If you have questions regarding the drawdown or if we can assist you in any
way, please do not hesitate to call the GPC office at 1-(706)-782-4014.
Rabun approximately eight feet (8’) starting October 25, 2010. Lake Rabun
will begin to refill on November 18, 2010 and returning to normal operating
level by November 25, 2010.
SEED DRAWDOWN: Drawdown scheduled for Lake Seed. We plan to lower Lake
Seed approximately twelve feet (12’) starting November 18, 2010. Lake Seed
will begin to refill on December 20, 2010 and returning to normal operating
level by December 31, 2010.
BURTON DRAWDOWN: Drawdown scheduled for Lake Burton. We plan to lower
Lake Burton approximately eight feet (8’) starting October 18, 2010. Lake
Burton will begin to refill on February 1, 2011 and returning to normal
operating level by May 1, 2011.
During the drawdown, fluctuations may occur on a daily basis due to
generation demand, rainfall, or other events.
To receive a construction permit for new structures or for maintenance of
existing structures, a construction application will have to be submitted,
along with plans, to Georgia Power for review and approval. Residents
planning to build a new seawall will need to complete a Buffer Disturbance
Request form that will have to be approved by County LIA before a permit
will be issued by Georgia Power.
If you have questions regarding the drawdown or if we can assist you in any
way, please do not hesitate to call the GPC office at 1-(706)-782-4014.
Subscribe to:
Posts (Atom)